DTE Monroe $10,600,000
flue gas desulfurization (scrubber)
Electrical installations for the Flue Gas Desulfurization of Units #1 and #2, consisting of 13.8 and 480volt switchgear and motor control centers, cable bus, DCS equipment, battery racks, 10,000 linear feet of cable tray, 514,000 linear feet of cable and 12,800 terminations.
1 / 5
2 / 5
3 / 5
4 / 5
5 / 5
Project was spread out through five different buildings over an 18 month schedule. Conti successfully completed the project on time with zero recordable and zero lost time injuries.