◄ Back to Project Portfolio
Henry Ford Hostpital A-4 $950,000
surgery waiting renovation
For the Henry Ford Hospital in Detroit, Conti Mechanical and HVAC designed and installed a new terminal unit variable air volume reheat system, 20 ton roof top unit, new steam to hot water heat exchanger, installation of new sheet metal duct distribution and new domestic hot water system with bathroom fixtures.
1 / 4
2 / 4
3 / 4
4 / 4