back to project portfolioBack to Project Porfolio

KEY FIGURES


Customer:
Ford Avon Lake
 
Project Value:
$1,400,000
 
Project Type:
Industrial
 
Region:
Midwest
 

TRADES INVOLVED

Upgrade to the paint system in Booth 2 for a new product. Conti installed 20,000 ft of 1-1/2" SS tubing supplying paint from the mix room to the paint booths.
 
1 / 3
2 / 3
3 / 3
 
Installed 80% of tubing and equipment during production and without interrupting operations. Shut down and cleaned existing paint piping during a 10 day downtime to switch to the new system.