KEY FIGURES |
| Customer: |
| Ford Avon Lake |
| Project Value: |
| $1,400,000 |
| Project Type: |
| Industrial |
| Region: |
| Midwest |
TRADES INVOLVED |
|
|
| Paint Circulation System |
| Upgrade to the paint system in Booth 2 for a new product. Conti installed 20,000 ft of 1-1/2" SS tubing supplying paint from the mix room to the paint booths. |
| Installed 80% of tubing and equipment during production and without interrupting operations. Shut down and cleaned existing paint piping during a 10 day downtime to switch to the new system. |