Paint Circulation System

Our Projects > Project Detail: Paint Circulation System

#image_title

Customer:

Ford Avon Lake

Project Value:

$1.4M

Project Type:

Industrial

Region:

Midwest

Trades Involved:

Upgrade to the paint system in Booth 2 for a new product. Conti installed 20,000 ft. of 1-1/2 in. SS tubing supplying paint from the mix room to the paint booths.

Installed 80% of tubing and equipment during production and without interrupting operations. Shut down and cleaned existing paint piping during a 10-day downtime to switch to the new system.

Connect with Conti!
We're Building It!

Let Us Know How We Can Work Together.

Connect with Conti